| A Literature-Based Staged Checklist for Pre-Feasibility Screening of Depleted Gas Reservoirs for Underground Hydrogen Storage |
| Paper ID : 1056-UGESR |
| Authors |
|
Leila Shekari Beiragh *1, Mehdi Parvini2 1No 2, Noure aval street,Valiasr alley, Tabriz, East Azarbaijan 2University of Tabriz |
| Abstract |
| Depleted gas reservoirs are frequently proposed as early candidates for underground hydrogen storage because their geology has already been characterised and surface facilities often exist. Published screening guidance for such sites is available, but it is distributed across subsurface, economic and regulatory literatures, and almost all of it presumes that the data needed to apply it are at hand — which, at the portfolio stage, is usually not the case. This work assembles that dispersed guidance into a five-stage pre-feasibility checklist and adds one element that the reviewed sources do not treat as a screening variable in its own right: the confidence attached to the input data. Each stage resolves to one of three outcomes, so that “insufficient information” becomes an explicit result directing data acquisition rather than a hidden assumption. The checklist is qualitative and deliberately coarse. It is meant for ranking candidates before engineering resources are committed, and it does not substitute for reservoir simulation, laboratory testing, formal hazard analysis or detailed cost estimation |
| Keywords |
| underground hydrogen storage; depleted gas reservoirs; site screening; pre-feasibility; cost drivers; data uncertainty |
| Status: Accepted (Poster Presentation) |